Thursday 23 April 2009


Here is the Finished Floor Level (FFL) staked out across the trench. This level is worked out via quite a complicated calculation relating to the level of the existing drain into which we will connect, and checked against the floor construction to make sure the drain pipe for the toilet can pass under the ground floor slab.

No comments:

Post a Comment