Monday 5 October 2009

Loads done over the weekend. Steel beam strapped down:
Bottom plate attached, with countersunk bolts:

Kitchen back wall panel complete, but not erected yet. Tonight's job:

And the rest of the walls around the kitchen complete barring wallplates:


Also the miniature stud wall that goes over the steel beam is done, just needs nailing in position.

One more load of timber, and we might have the walls complete!

No comments:

Post a Comment