Monday 22 March 2010

Service trench now 1m deep most of the way:All thanks to this man: Also finished, is the back wall insulation OSB and Tyvek, and we would also have finished the battening if my cordless drill hadn't run out of battery.
At the front, we put on some mesh and I levelled the ground in front of the front door, using the spoil Alex was digging up from the service trench. Alex is a weird ghostly figure in this picture, as he attempted to run into the photo:


Emma also inserted all of the high level insulation to the top of the side wall.

1 comment:

  1. not to be awkward, but why the dogleg in the trench? surely straight would have been better?

    ReplyDelete