Wednesday 17 February 2010

A simple task last night, measuring up for the floor insulation, roof edge trims, cedar boarding, and foul drainage. Reassuringly, everything came out as I was expecting it to having scaled off my CAD drawings.

We also checked the maximum height of the building above ground level - 3.55m. Once you add on 25mm for the upstand of the roof edge trim you get 3.575m, exactly that as stated on my original planning drawing.

As I am back on 4 day weeks temporarily (I hope!), we're going to try and organise a few deliveries to arrive on the days I have off.