Photo update of the front door frame installed, and the mesh completed around it. This is before the stainless beads were added, and obviously before the floor was screeded too:
Once we have fitted the front door, in theory we could move in! But really we want the walls insulated first, and that means doing the electric and plumbing 1st fixes aswell. All of that should be complete by July though, so potentially we could be living in our house by the summer!!

1 comment:

  1. do you have a "spec" from your sparky yet?

    how are you dealing with the compression of the insulation and continuity of the vapour barrier that you'll be installing where the sockets will be cut into the plasterboard..

    ReplyDelete