Thursday 16 September 2010

Saw the man from Central Networks (E-on) this morning. They will deliver 3m lengths of 125mm ducting to site, along with the necessary warning tape, and basically once that arrives we can fill the trench back in around it. So all that we need now is the inspection from Severn Trent to confirm they are happy with our water pipe installation to fill in the first bit up to where the electricity cable goes - and we can use the drive again!! With a bit of luck, this will all be done before our neighbours come back from Australia, which would be brilliant :)

Tonight I will carry on with crack filling, fit the seal around the front door, and possibly the security light aswell, depending on how well I get on.

No comments:

Post a Comment